Solar PUC Basic functioning in brief
Solar PCU During the day initially the Solar energy is utilized for charging the battery, load will be on the Grid until battery gets charged up to 90% of its capacity, once it reaches this level, load will get transferred to the inverter, Grid will get disconnected, load will be shared with the available solar energy & battery (as solar energy will keep charging the battery hence the balance will go to load until the battery gets fully charged).
In case the Solar energy declines power to the connected load will be shared between Solar & Battery, once the battery gets discharged to the set level, the load will automatically get transferred to the Grid.
Battery discharge level setting.
External POT to set the battery discharge level(10%-90%), which will determine the charge that can be dynamically utilized for power saving, the rest for battery back during power failure.
Maximum power point tracking (MPPT) technology (unlike the conventional PWM) ensures maximum utilisation of the available solar power.
Downloads
Solar PCU UPS Write-up
CUSTOMER NAME |
CONTACT PERSON |
LOCATION |
CAPACITY |
TYPE OF INDUSTRY |
ADANI INFRA INDIA LIMITED |
MR.AMIT |
CHENNAI |
100KW X 2 NO'S SOLAR UPS |
POWER PLANT |
ARDEX ENDURA INDIA PVT.LTD |
MR.REDDY |
BANGALORE |
40KVA GSS UPS |
MANUFACTURING OF ADHESIVE WATERPROOFING PRODUCTS |
SUKRIT MUSHROOM NURSERY |
MR.SANGMESHAN |
BANGALORE |
20 KVA GSS UPS |
FOR MUSHROOM NURSERY |
GREEN PEACE |
MR.HAFIZ |
BANGALORE |
15KW GSS UPS |
NGO OFFICE USE |
IOCL PETROL PUMP |
MR.RAMESH |
MANDYA |
5KVA GSS UPS |
PETROL PUMP |
SPARR ELECTRONCS |
MR.PRAKASH |
BANGALORE |
5KW MPPT |
FOR PC AND LIGHTING |
CHETANA PRECI PRODUCTS |
MR.SUDHAKAR |
BANGALORE |
3KVA SOLAR PCU |
LIGHING LOAD |
MR.SATYANARAYAN |
MR.SATYANARAYAN |
BANGALORE |
3KVA SOLAR PCU |
HOME LIGHTING |
J J POLYMERS |
MR.SRINIVAS |
BANGALORE |
10KW GSS UPS |
PC AND LIGHTING |
WIDIA SCHOOL |
MR.SRIDHAR |
BANGALORE |
3KVA MPPT |
FOR LIGHTING |